qty. |
€ |
€ |
$ (approx.) |
$ (approx.) |
| |
|
|
|
|
|
|
| Installation materials |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| Copper pipes 22 mm |
50 |
m |
185.00 |
|
231.00 |
|
| Copper pipes 15 mm |
30 |
m |
111.00 |
|
139.00 | |
| Copper pipes 12 mm |
60 |
m |
222.00 | |
278.00 | |
| Compressed air outlet |
12 |
pcs |
1,028.04 | |
1,285.00 | |
| Oxygen outlet |
12 |
pcs |
1,028.04 | |
1,285.00 | |
| Compressed air outlet valve G3/8" |
12 |
pcs |
258.60 | |
323.00 | |
| Oxygen outlet valve G3/8" |
12 |
pcs |
258.60 | |
323.00 | |
| Oxygen flowmeter |
12 |
pcs |
2,008.08 | |
2,510.00 | |
| Humidifier Parkodex Mod 83 |
12 |
pcs |
903.48 | |
1,129.00 | |
| Vacuum injector |
12 |
pcs |
2,719.32 | |
3,399.00 | |
| Tehaliet |
75 |
m |
2,937.75 | |
3,672.00 | |
| Ceiling |
100 |
m² |
12,500.00 | |
15,625.00 | |
| Light fitting |
8 |
pcs |
2,000.00 | |
2,500.00 | |
| Cable |
|
|
500.00 | |
625.00 | |
| Fixing materials |
|
|
200.00 | |
250.00 | |
| Tools |
|
|
100.00 | |
125.00 | |
| |
|
|
|
| | |
| Subtotal |
|
| |
26,959.91 | |
33,700.00 |
| |
|
|
|
| | |
| Transport and accommodation* |
| | |
|
|
|
| | | |
|
|
|
|
| Cargo transport |
|
|
2,700.00 | |
3,375.00 | |
| Transport of passengers, bus |
|
|
1,500.00 | |
1,875.00 | |
| Fuel |
|
|
350.00 | |
437.00 | |
| Insurance |
|
|
45.00 | |
56.00 | |
| Traveling expenses (incl. toll) |
|
|
200.00 | |
250.00 | |
| |
|
|
|
| | |
| Subtotal |
|
| |
4,795.00 | |
5,993.00 |
| | | |
|
|
|
|
| | | |
|
|
|
|
| Total |
| |
|
31,754.91 | |
39,693.00 |
| | | |
|
|
|
|
| * |
Transport and accommodation expenses have been included in all costing's separately. Not every project will have its own transport and accommodation. To reduce costs we strive for 1 transport for all projects. |
|
 |